EveBoosters

LINKING…

Shadow Serpentis Ion Siege Blaster

Market detail
Blueprint #41137Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Shadow Serpentis Ion Siege Blaster no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job227,931,403.6
Install fee49,834,296.34
Total cost, whole job277,765,699.94
Cost per unit277,765,699.94
Profit / unit
202,486,850.06
Margin
72.9%
Profit, whole job (1 unit)202,486,850.06
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job183,507,801.12
Install fee49,834,296.34
Total cost, whole job233,342,097.46
Cost per unit233,342,097.46
Profit / unit
246,910,452.54
Margin
105.8%
Profit, whole job (1 unit)246,910,452.54
Job install fee
Estimated Item Value (EIV)232,003,241.8
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 232,003,241.8 × 21.48%
Install fee, whole job49,834,296.34

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit497,800,000
Jita buy price, per unit259,400,000
Sales tax (2.02%)-10,080,450
Broker fee (1.50%)-7,467,000
Net revenue, per unit480,252,550
Net revenue, whole job (1 unit)480,252,550

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Compact Compounds2826147,000138,0003,822,0003,588,000127,644.03
Compact Conductors282623,00019,000598,000494,00023,200.38
Compact Electronics262410,1905,600244,560134,4009,962.2
Enduring Compounds26243,3801,10081,12026,4001,162.92
Enduring Conductors363311,2903,700372,570122,1003,478.72
Enduring Electronics36337,8172,054257,96167,7825,333.88
Ion Siege Blaster II11222,300,000179,000,000222,300,000179,000,000225,383,042.61
Precise Compounds322918050.185,2201,455.22185
Precise Conductors2826564.7175.914,682.24,573.458,430.02
Precise Electronics2826899.981.0523,397.42,107.3141.3
Scoped Compounds32291,49990043,47126,1002,642.91
Scoped Conductors34313,994800123,81424,8001,283.07
Scoped Electronics35321,394502.644,60816,083.2455.27
Materials, whole job227,931,403.6183,507,801.12232,003,241.8

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.