Domination Hexa 2500mm Repeating Cannon
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Ample Compounds | 35 | 32 | 61,970 | 52.01 | 1,983,040 | 1,664.32 | 109,032.98 |
| Ample Conductors | 36 | 33 | 747.7 | 73.69 | 24,674.1 | 2,431.77 | 94.93 |
| Ample Electronics | 42 | 38 | 239.6 | 8.32 | 9,104.8 | 316.16 | 71,750.48 |
| Compact Compounds | 36 | 33 | 147,000 | 138,000 | 4,851,000 | 4,554,000 | 127,644.03 |
| Compact Conductors | 29 | 27 | 23,000 | 19,000 | 621,000 | 513,000 | 23,200.38 |
| Compact Electronics | 34 | 31 | 10,190 | 5,600 | 315,890 | 173,600 | 9,962.2 |
| Hexa 2500mm Repeating Cannon II | 1 | 1 | 197,000,000 | 175,400,000 | 197,000,000 | 175,400,000 | 168,646,444.56 |
| Precise Compounds | 43 | 39 | 180 | 50.18 | 7,020 | 1,957.02 | 185 |
| Precise Conductors | 35 | 32 | 564.7 | 175.9 | 18,070.4 | 5,628.8 | 58,430.02 |
| Precise Electronics | 32 | 29 | 899.9 | 81.05 | 26,097.1 | 2,350.45 | 141.3 |
| Scoped Compounds | 39 | 36 | 1,499 | 900 | 53,964 | 32,400 | 2,642.91 |
| Scoped Conductors | 39 | 36 | 3,994 | 800 | 143,784 | 28,800 | 1,283.07 |
| Scoped Electronics | 36 | 33 | 1,394 | 502.6 | 46,002 | 16,585.8 | 455.27 |
| Materials, whole job | 205,099,646.4 | 180,732,734.32 | 183,313,277.48 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 2 trades/day, 3 units/day.