EveBoosters

LINKING…

Domination Quad 3500mm Siege Artillery

Market detail
Blueprint #41173Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Domination Quad 3500mm Siege Artillery no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job239,005,228.5
Install fee67,185,948.39
Total cost, whole job306,191,176.89
Cost per unit306,191,176.89
Profit / unit
175,219,073.11
Margin
57.2%
Profit, whole job (1 unit)175,219,073.11
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job190,766,009.94
Install fee67,185,948.39
Total cost, whole job257,951,958.33
Cost per unit257,951,958.33
Profit / unit
223,458,291.67
Margin
86.6%
Profit, whole job (1 unit)223,458,291.67
Job install fee
Estimated Item Value (EIV)312,783,744.84
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 312,783,744.84 × 21.48%
Install fee, whole job67,185,948.39

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit499,000,000
Jita buy price, per unit286,900,000
Sales tax (2.02%)-10,104,750
Broker fee (1.50%)-7,485,000
Net revenue, per unit481,410,250
Net revenue, whole job (1 unit)481,410,250

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Ample Compounds484461,97052.012,726,6802,288.44109,032.98
Ample Conductors1211747.773.698,224.7810.5994.93
Ample Electronics4137239.68.328,865.2307.8471,750.48
Compact Compounds5853147,000138,0007,791,0007,314,000127,644.03
Compact Conductors10923,00019,000207,000171,00023,200.38
Compact Electronics403610,1905,600366,840201,6009,962.2
Precise Compounds544918050.188,8202,458.82185
Precise Conductors109564.7175.95,082.31,583.158,430.02
Precise Electronics2927899.981.0524,297.32,188.35141.3
Quad 3500mm Siege Artillery II11227,700,000183,000,000227,700,000183,000,000295,793,504.07
Scoped Compounds58531,49990079,44747,7002,642.91
Scoped Conductors11103,99480039,9408,0001,283.07
Scoped Electronics31281,394502.639,03214,072.8455.27
Materials, whole job239,005,228.5190,766,009.94312,783,744.84

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.