Domination Quad 3500mm Siege Artillery
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Ample Compounds | 48 | 44 | 61,970 | 52.01 | 2,726,680 | 2,288.44 | 109,032.98 |
| Ample Conductors | 12 | 11 | 747.7 | 73.69 | 8,224.7 | 810.59 | 94.93 |
| Ample Electronics | 41 | 37 | 239.6 | 8.32 | 8,865.2 | 307.84 | 71,750.48 |
| Compact Compounds | 58 | 53 | 147,000 | 138,000 | 7,791,000 | 7,314,000 | 127,644.03 |
| Compact Conductors | 10 | 9 | 23,000 | 19,000 | 207,000 | 171,000 | 23,200.38 |
| Compact Electronics | 40 | 36 | 10,190 | 5,600 | 366,840 | 201,600 | 9,962.2 |
| Precise Compounds | 54 | 49 | 180 | 50.18 | 8,820 | 2,458.82 | 185 |
| Precise Conductors | 10 | 9 | 564.7 | 175.9 | 5,082.3 | 1,583.1 | 58,430.02 |
| Precise Electronics | 29 | 27 | 899.9 | 81.05 | 24,297.3 | 2,188.35 | 141.3 |
| Quad 3500mm Siege Artillery II | 1 | 1 | 227,700,000 | 183,000,000 | 227,700,000 | 183,000,000 | 295,793,504.07 |
| Scoped Compounds | 58 | 53 | 1,499 | 900 | 79,447 | 47,700 | 2,642.91 |
| Scoped Conductors | 11 | 10 | 3,994 | 800 | 39,940 | 8,000 | 1,283.07 |
| Scoped Electronics | 31 | 28 | 1,394 | 502.6 | 39,032 | 14,072.8 | 455.27 |
| Materials, whole job | 239,005,228.5 | 190,766,009.94 | 312,783,744.84 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.