EveBoosters

LINKING…

Shadow Serpentis 10000MN Afterburner

Market detail
Blueprint #41248Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 912.9M/day
Illiquid. Shadow Serpentis 10000MN Afterburner trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job199,394,733
Install fee46,080,100.75
Total cost, whole job245,474,833.75
Cost per unit245,474,833.75
Profit / unit
593,857,666.25
Margin
241.9%
Profit, whole job (1 unit)593,857,666.25
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job167,485,586
Install fee46,080,100.75
Total cost, whole job213,565,686.75
Cost per unit213,565,686.75
Profit / unit
625,766,813.25
Margin
293.0%
Profit, whole job (1 unit)625,766,813.25
Job install fee
Estimated Item Value (EIV)214,525,608.72
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 214,525,608.72 × 21.48%
Install fee, whole job46,080,100.75

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit870,000,000
Jita buy price, per unit400,300,000
Sales tax (2.02%)-17,617,500
Broker fee (1.50%)-13,050,000
Net revenue, per unit839,332,500
Net revenue, whole job (1 unit)839,332,500

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
10000MN Afterburner II11195,600,000164,300,000195,600,000164,300,000210,996,135.82
Compact Compounds2018147,000138,0002,646,0002,484,000127,644.03
Compact Conductors302723,00019,000621,000513,00023,200.38
Compact Electronics10910,1905,60091,71050,4009,962.2
Enduring Compounds20183,3801,10060,84019,8001,162.92
Enduring Conductors302711,2903,700304,83099,9003,478.72
Enduring Electronics1097,8172,05470,35318,4865,333.88
Materials, whole job199,394,733167,485,586214,525,608.72

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.1 trades/day, 1 units/day.