EveBoosters

LINKING…

Capital S95a Scoped Remote Shield Booster

Market detail
Blueprint #41668Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 106.7M/day
Illiquid. Capital S95a Scoped Remote Shield Booster trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job43,972,153
Install fee7,204,499.2
Total cost, whole job51,176,652.2
Cost per unit51,176,652.2
Profit / unit
-12,702,422.2
Margin
-24.8%
Profit, whole job (1 unit)-12,702,422.2
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job34,074,978
Install fee7,204,499.2
Total cost, whole job41,279,477.2
Cost per unit41,279,477.2
Profit / unit
-2,805,247.2
Margin
-6.8%
Profit, whole job (1 unit)-2,805,247.2
Job install fee
Estimated Item Value (EIV)33,540,499.07
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 33,540,499.07 × 21.48%
Install fee, whole job7,204,499.2

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit39,880,000
Jita buy price, per unit20,590,000
Sales tax (2.02%)-807,570
Broker fee (1.50%)-598,200
Net revenue, per unit38,474,230
Net revenue, whole job (1 unit)38,474,230

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Remote Shield Booster I1143,800,00034,020,00043,800,00034,020,00033,426,042.6
Scoped Compounds25231,49990034,47720,7002,642.91
Scoped Conductors26243,99480095,85619,2001,283.07
Scoped Electronics33301,394502.641,82015,078455.27
Materials, whole job43,972,15334,074,97833,540,499.07

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.8 trades/day, 3 units/day.