EveBoosters

LINKING…

Dread Guristas Capital Remote Shield Booster

Market detail
Blueprint #41670Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 653.0M/day
Illiquid. Dread Guristas Capital Remote Shield Booster trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job49,495,887
Install fee8,277,056.88
Total cost, whole job57,772,943.88
Cost per unit57,772,943.88
Profit / unit
366,524,106.12
Margin
634.4%
Profit, whole job (1 unit)366,524,106.12
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job38,651,028.2
Install fee8,277,056.88
Total cost, whole job46,928,085.08
Cost per unit46,928,085.08
Profit / unit
377,368,964.92
Margin
804.1%
Profit, whole job (1 unit)377,368,964.92
Job install fee
Estimated Item Value (EIV)38,533,784.35
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 38,533,784.35 × 21.48%
Install fee, whole job8,277,056.88

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit439,800,000
Jita buy price, per unit190,000,000
Sales tax (2.02%)-8,905,950
Broker fee (1.50%)-6,597,000
Net revenue, per unit424,297,050
Net revenue, whole job (1 unit)424,297,050

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Remote Shield Booster I1143,800,00034,020,00043,800,00034,020,00033,426,042.6
Compact Compounds2927147,000138,0003,969,0003,726,000127,644.03
Compact Conductors272523,00019,000575,000475,00023,200.38
Compact Electronics343110,1905,600315,890173,6009,962.2
Enduring Compounds33303,3801,100101,40033,0001,162.92
Enduring Conductors312811,2903,700316,120103,6003,478.72
Enduring Electronics29277,8172,054211,05955,4585,333.88
Scoped Compounds31281,49990041,97225,2002,642.91
Scoped Conductors35323,994800127,80825,6001,283.07
Scoped Electronics29271,394502.637,63813,570.2455.27
Materials, whole job49,495,88738,651,028.238,533,784.35

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 2.1 trades/day, 2 units/day.