EveBoosters

LINKING…

Shadow Serpentis Capital Flex Armor Hardener

Market detail
Blueprint #41660Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 559.0M/day
Illiquid. Shadow Serpentis Capital Flex Armor Hardener trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job100,618,375.2
Install fee15,357,980.62
Total cost, whole job115,976,355.82
Cost per unit115,976,355.82
Profit / unit
245,515,469.18
Margin
211.7%
Profit, whole job (1 unit)245,515,469.18
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job76,052,139.4
Install fee15,357,980.62
Total cost, whole job91,410,120.02
Cost per unit91,410,120.02
Profit / unit
270,081,704.98
Margin
295.5%
Profit, whole job (1 unit)270,081,704.98
Job install fee
Estimated Item Value (EIV)71,498,978.67
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 71,498,978.67 × 21.48%
Install fee, whole job15,357,980.62

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit374,700,000
Jita buy price, per unit244,200,000
Sales tax (2.02%)-7,587,675
Broker fee (1.50%)-5,620,500
Net revenue, per unit361,491,825
Net revenue, whole job (1 unit)361,491,825

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Flex Armor Hardener II1195,820,00071,710,00095,820,00071,710,00065,352,356.66
Compact Compounds3431147,000138,0004,557,0004,278,000127,644.03
Enduring Electronics32297,8172,054226,69359,5665,333.88
Precise Conductors2826564.7175.914,682.24,573.458,430.02
Materials, whole job100,618,375.276,052,139.471,498,978.67

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.4 trades/day, 1 units/day.