EveBoosters

LINKING…

Dread Guristas Capital Flex Shield Hardener

Market detail
Blueprint #41661Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 369.2M/day
Illiquid. Dread Guristas Capital Flex Shield Hardener trades under 5 times a day; under 10 units traded a day; best buy order is a token bid far below the usual price; buy and sell prices are too far apart to be a real spread. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job83,698,183
Install fee15,477,536.72
Total cost, whole job99,175,719.72
Cost per unit99,175,719.72
Profit / unit
226,909,780.28
Margin
228.8%
Profit, whole job (1 unit)226,909,780.28
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job64,450,681
Install fee15,477,536.72
Total cost, whole job79,928,217.72
Cost per unit79,928,217.72
Profit / unit
246,157,282.28
Margin
308.0%
Profit, whole job (1 unit)246,157,282.28
Job install fee
Estimated Item Value (EIV)72,055,571.31
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 72,055,571.31 × 21.48%
Install fee, whole job15,477,536.72

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit338,000,000
Jita buy price, per unit197,300
Sales tax (2.02%)-6,844,500
Broker fee (1.50%)-5,070,000
Net revenue, per unit326,085,500
Net revenue, whole job (1 unit)326,085,500

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Capital Flex Shield Hardener II1179,950,00061,080,00079,950,00061,080,00066,659,286.96
Compact Compounds2624147,000138,0003,528,0003,312,000127,644.03
Enduring Electronics28267,8172,054203,24253,4045,333.88
Precise Conductors3330564.7175.916,9415,27758,430.02
Materials, whole job83,698,18364,450,68172,055,571.31

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.5 trades/day, 2 units/day.