Vanquisher
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 3,200 | 2,880 | 48,660 | 45,100 | 140,140,800 | 129,888,000 | 8,583.01 |
| Capital Armor Plates | 300 | 270 | 17,650,000 | 15,190,000 | 4,765,500,000 | 4,101,300,000 | 7,562,886.21 |
| Capital Capacitor Battery | 400 | 360 | 13,940,000 | 12,560,000 | 5,018,400,000 | 4,521,600,000 | 8,263,022.41 |
| Capital Clone Vat Bay | 500 | 450 | 39,350,000 | 24,540,000 | 17,707,500,000 | 11,043,000,000 | 15,834,776.52 |
| Capital Computer System | 100 | 90 | 13,550,000 | 11,880,000 | 1,219,500,000 | 1,069,200,000 | 7,823,927.57 |
| Capital Construction Parts | 200 | 180 | 9,186,000 | 8,421,000 | 1,653,480,000 | 1,515,780,000 | 11,323,984.26 |
| Capital Core Temperature Regulator | 25 | 23 | 194,500,000 | 185,000,000 | 4,473,500,000 | 4,255,000,000 | 201,825,323.34 |
| Capital Corporate Hangar Bay | 500 | 450 | 18,290,000 | 12,890,000 | 8,230,500,000 | 5,800,500,000 | 13,378,211.63 |
| Capital Doomsday Weapon Mount | 500 | 450 | 32,870,000 | 23,820,000 | 14,791,500,000 | 10,719,000,000 | 16,861,594.16 |
| Capital Jump Bridge Array | 500 | 450 | 39,940,000 | 30,140,000 | 17,973,000,000 | 13,563,000,000 | 21,190,015.66 |
| Capital Jump Drive | 300 | 270 | 18,500,000 | 15,730,000 | 4,995,000,000 | 4,247,100,000 | 13,358,196.01 |
| Capital Power Generator | 300 | 270 | 18,150,000 | 15,110,000 | 4,900,500,000 | 4,079,700,000 | 17,362,543.19 |
| Capital Propulsion Engine | 80 | 72 | 13,300,000 | 10,730,000 | 957,600,000 | 772,560,000 | 13,818,010.19 |
| Capital Sensor Cluster | 200 | 180 | 12,200,000 | 10,300,000 | 2,196,000,000 | 1,854,000,000 | 12,326,197.23 |
| Capital Shield Emitter | 150 | 135 | 16,730,000 | 13,140,000 | 2,258,550,000 | 1,773,900,000 | 9,171,499.82 |
| Capital Ship Maintenance Bay | 500 | 450 | 17,730,000 | 15,620,000 | 7,978,500,000 | 7,029,000,000 | 16,885,324.71 |
| Capital Turret Hardpoint | 400 | 360 | 12,570,000 | 9,068,000 | 4,525,200,000 | 3,264,480,000 | 13,199,463.22 |
| Enhanced Neurolink Protection Cell | 1 | 1 | 22,770,000,000 | 18,000,000,000 | 22,770,000,000 | 18,000,000,000 | 639,090,499.9 |
| G-O Trigger Neurolink Conduit | 96 | 87 | 15,950,000 | 13,130,000 | 1,387,650,000 | 1,142,310,000 | 475,116.13 |
| Ladar-FTL Interlink Communicator | 125 | 113 | 107,600,000 | 91,670,000 | 12,158,800,000 | 10,358,710,000 | 12,850,194.57 |
| Life Support Backup Unit | 1,600 | 1,440 | 81,070 | 79,000 | 116,740,800 | 113,760,000 | 9,578.12 |
| Magnetometric-FTL Interlink Communicator | 125 | 113 | 98,530,000 | 81,700,000 | 11,133,890,000 | 9,232,100,000 | 9,407,225.16 |
| Serpentis Modified Capital Microprocessor | 100 | 90 | 488,900 | 89,420 | 44,001,000 | 8,047,800 | — |
| S-R Trigger Neurolink Conduit | 96 | 87 | 19,230,000 | 17,720,000 | 1,673,010,000 | 1,541,640,000 | 459,966.78 |
| Materials, whole job | 153,068,462,600 | 120,135,575,800 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.