Standup L-Set ME Research Optimization I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Broken Drone Transceiver | 24,000 | 21,600 | 2,890 | 2,713 | 62,424,000 | 58,600,800 | 73.8 |
| Burned Logic Circuit | 2,400 | 2,160 | 44,560 | 44,550 | 96,249,600 | 96,228,000 | 19,367.54 |
| Charred Micro Circuit | 24,000 | 21,600 | 375.1 | 375 | 8,102,160 | 8,100,000 | 325.24 |
| Damaged Artificial Neural Network | 24,000 | 21,600 | 240.2 | 240.1 | 5,188,320 | 5,186,160 | 252.3 |
| Defective Current Pump | 24,000 | 21,600 | 12,060 | 11,220 | 260,496,000 | 242,352,000 | 415.28 |
| Fried Interface Circuit | 12,000 | 10,800 | 3,394 | 3,393 | 36,655,200 | 36,644,400 | 2,198.64 |
| Melted Capacitor Console | 12,000 | 10,800 | 3,041 | 3,040 | 32,842,800 | 32,832,000 | 4,796.96 |
| Scorched Telemetry Processor | 24,000 | 21,600 | 2,001 | 2,000 | 43,221,600 | 43,200,000 | 61.59 |
| Smashed Trigger Unit | 24,000 | 21,600 | 4,611 | 4,610 | 99,597,600 | 99,576,000 | 73.06 |
| Thruster Console | 24,000 | 21,600 | 8,366 | 7,615 | 180,705,600 | 164,484,000 | 45.02 |
| Materials, whole job | 825,482,880 | 787,203,360 | 160,340,104.66 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.