Standup M-Set Blueprint Copy Cost Optimization I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Broken Drone Transceiver | 3,200 | 2,880 | 2,890 | 2,713 | 8,323,200 | 7,813,440 | 73.8 |
| Burned Logic Circuit | 320 | 288 | 44,560 | 44,550 | 12,833,280 | 12,830,400 | 19,367.54 |
| Charred Micro Circuit | 3,200 | 2,880 | 375.1 | 375 | 1,080,288 | 1,080,000 | 325.24 |
| Damaged Artificial Neural Network | 3,200 | 2,880 | 240.2 | 240.1 | 691,776 | 691,488 | 252.3 |
| Defective Current Pump | 3,200 | 2,880 | 12,060 | 11,220 | 34,732,800 | 32,313,600 | 415.28 |
| Fried Interface Circuit | 1,600 | 1,440 | 3,394 | 3,393 | 4,887,360 | 4,885,920 | 2,198.64 |
| Melted Capacitor Console | 1,600 | 1,440 | 3,041 | 3,040 | 4,379,040 | 4,377,600 | 4,796.96 |
| Scorched Telemetry Processor | 3,200 | 2,880 | 2,001 | 2,000 | 5,762,880 | 5,760,000 | 61.59 |
| Smashed Trigger Unit | 3,200 | 2,880 | 4,611 | 4,610 | 13,279,680 | 13,276,800 | 73.06 |
| Thruster Console | 3,200 | 2,880 | 8,366 | 7,615 | 24,094,080 | 21,931,200 | 45.02 |
| Materials, whole job | 110,064,384 | 104,960,448 | 21,378,680.62 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.2 trades/day, 1 units/day.