Standup M-Set Blueprint Copy Accelerator II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 700 | 630 | 1,117 | 1,016 | 703,710 | 640,080 | 1,050.3 |
| Capacitor Console | 16 | 15 | 161,600 | 161,500 | 2,424,000 | 2,422,500 | 186,235.47 |
| Current Pump | 700 | 630 | 144,500 | 106,100 | 91,035,000 | 66,843,000 | 113,977.99 |
| Drone Transceiver | 700 | 630 | 55,000 | 53,000 | 34,650,000 | 33,390,000 | 21,974.08 |
| Impetus Console | 1,300 | 1,170 | 89,740 | 73,630 | 104,995,800 | 86,147,100 | 8,162.59 |
| Interface Circuit | 16 | 15 | 24,490 | 21,920 | 367,350 | 328,800 | 16,386.38 |
| Logic Circuit | 16 | 15 | 2,427,000 | 2,384,000 | 36,405,000 | 35,760,000 | 162,531.17 |
| Micro Circuit | 700 | 630 | 5,357 | 5,356 | 3,374,910 | 3,374,280 | 5,230.5 |
| R.A.M.- Electronics | 1 | 1 | 613.8 | 501.7 | 613.8 | 501.7 | 562.82 |
| Telemetry Processor | 700 | 630 | 154,500 | 145,000 | 97,335,000 | 91,350,000 | 20,303.43 |
| Trigger Unit | 700 | 630 | 498,500 | 417,100 | 314,055,000 | 262,773,000 | 43,063.99 |
| Materials, whole job | 685,346,383.8 | 583,029,261.7 | 160,374,585.94 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.2 trades/day, 1 units/day.