Small Command Processor I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Charred Micro Circuit | 12 | 11 | 399 | 364.5 | 4,389 | 4,009.5 | 325.24 |
| Conductive Polymer | 5 | 5 | 27,820 | 24,050 | 139,100 | 120,250 | 402.03 |
| Damaged Artificial Neural Network | 10 | 9 | 257 | 240.1 | 2,313 | 2,160.9 | 252.3 |
| Fried Interface Circuit | 5 | 5 | 3,548 | 3,393 | 17,740 | 16,965 | 2,198.64 |
| Materials, whole job | 163,542 | 143,385.4 | 19,429.18 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 59.3 trades/day, 179 units/day.