Standup M-Set Moon Drilling Efficiency I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Armor Plates | 1,600 | 1,440 | 23,140 | 23,130 | 33,321,600 | 33,307,200 | 28,391.7 |
| Burned Logic Circuit | 1,600 | 1,440 | 44,560 | 44,550 | 64,166,400 | 64,152,000 | 19,367.54 |
| Charred Micro Circuit | 3,200 | 2,880 | 375.1 | 375 | 1,080,288 | 1,080,000 | 325.24 |
| Contaminated Lorentz Fluid | 1,600 | 1,440 | 62,510 | 62,500 | 90,014,400 | 90,000,000 | 383.8 |
| Damaged Artificial Neural Network | 1,600 | 1,440 | 240.2 | 240.1 | 345,888 | 345,744 | 252.3 |
| Defective Current Pump | 3,200 | 2,880 | 12,060 | 11,220 | 34,732,800 | 32,313,600 | 415.28 |
| Fried Interface Circuit | 1,600 | 1,440 | 3,394 | 3,393 | 4,887,360 | 4,885,920 | 2,198.64 |
| Malfunctioning Shield Emitter | 1,600 | 1,440 | 244.3 | 244.2 | 351,792 | 351,648 | 395.08 |
| Melted Capacitor Console | 1,600 | 1,440 | 3,041 | 3,040 | 4,379,040 | 4,377,600 | 4,796.96 |
| Tangled Power Conduit | 1,600 | 1,440 | 82,550 | 76,330 | 118,872,000 | 109,915,200 | 431.02 |
| Materials, whole job | 352,151,568 | 340,728,912 | 92,316,876.9 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 2.1 trades/day, 3 units/day.