Standup M-Set Moon Drilling Stability II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 1,200 | 1,080 | 1,117 | 1,016 | 1,206,360 | 1,097,280 | 1,050.3 |
| Capacitor Console | 28 | 26 | 161,600 | 161,500 | 4,201,600 | 4,199,000 | 186,235.47 |
| Enhanced Ward Console | 16 | 15 | 980,000 | 922,700 | 14,700,000 | 13,840,500 | 1,052,137.06 |
| Intact Shield Emitter | 16 | 15 | 375,300 | 375,200 | 5,629,500 | 5,628,000 | 341,920.51 |
| Interface Circuit | 760 | 684 | 24,490 | 21,920 | 16,751,160 | 14,993,280 | 16,386.38 |
| Logic Circuit | 28 | 26 | 2,427,000 | 2,384,000 | 63,102,000 | 61,984,000 | 162,531.17 |
| Lorentz Fluid | 1,200 | 1,080 | 1,957,000 | 1,801,000 | 2,113,560,000 | 1,945,080,000 | 25,876 |
| Nanite Compound | 28 | 26 | 2,543,000 | 2,427,000 | 66,118,000 | 63,102,000 | 131,435.16 |
| Power Circuit | 760 | 684 | 289,000 | 278,400 | 197,676,000 | 190,425,600 | 303,263.46 |
| Power Conduit | 760 | 684 | 192,200 | 179,000 | 131,464,800 | 122,436,000 | 28,267.44 |
| R.A.M.- Robotics | 1 | 1 | 699.9 | 534.2 | 699.9 | 534.2 | 597.38 |
| Materials, whole job | 2,614,410,119.9 | 2,422,786,194.2 | 332,479,849.94 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.5 trades/day, 2 units/day.