Standup L-Set Moon Drilling Proficiency I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Armor Plates | 12,000 | 10,800 | 23,140 | 23,130 | 249,912,000 | 249,804,000 | 28,391.7 |
| Burned Logic Circuit | 12,000 | 10,800 | 44,560 | 44,550 | 481,248,000 | 481,140,000 | 19,367.54 |
| Charred Micro Circuit | 24,000 | 21,600 | 375.1 | 375 | 8,102,160 | 8,100,000 | 325.24 |
| Contaminated Lorentz Fluid | 12,000 | 10,800 | 62,510 | 62,500 | 675,108,000 | 675,000,000 | 383.8 |
| Damaged Artificial Neural Network | 12,000 | 10,800 | 240.2 | 240.1 | 2,594,160 | 2,593,080 | 252.3 |
| Defective Current Pump | 24,000 | 21,600 | 12,060 | 11,220 | 260,496,000 | 242,352,000 | 415.28 |
| Fried Interface Circuit | 12,000 | 10,800 | 3,394 | 3,393 | 36,655,200 | 36,644,400 | 2,198.64 |
| Malfunctioning Shield Emitter | 12,000 | 10,800 | 244.3 | 244.2 | 2,638,440 | 2,637,360 | 395.08 |
| Melted Capacitor Console | 12,000 | 10,800 | 3,041 | 3,040 | 32,842,800 | 32,832,000 | 4,796.96 |
| Tangled Power Conduit | 12,000 | 10,800 | 82,550 | 76,330 | 891,540,000 | 824,364,000 | 431.02 |
| Materials, whole job | 2,641,136,760 | 2,555,466,840 | 692,376,576.73 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.2 trades/day, 1 units/day.