Standup M-Set Composite Reactor Time Efficiency II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Artificial Neural Network | 1,200 | 1,080 | 1,117 | 1,016 | 1,206,360 | 1,097,280 | 1,050.3 |
| Current Pump | 200 | 180 | 144,500 | 106,100 | 26,010,000 | 19,098,000 | 113,977.99 |
| Intact Armor Plates | 28 | 26 | 1,765,000 | 1,609,000 | 45,890,000 | 41,834,000 | 1,860,141.18 |
| Lorentz Fluid | 1,200 | 1,080 | 1,957,000 | 1,801,000 | 2,113,560,000 | 1,945,080,000 | 25,876 |
| Micro Circuit | 1,200 | 1,080 | 5,357 | 5,356 | 5,785,560 | 5,784,480 | 5,230.5 |
| Nanite Compound | 16 | 15 | 2,543,000 | 2,427,000 | 38,145,000 | 36,405,000 | 131,435.16 |
| Power Conduit | 28 | 26 | 192,200 | 179,000 | 4,997,200 | 4,654,000 | 28,267.44 |
| R.A.M.- Robotics | 1 | 1 | 699.9 | 534.2 | 699.9 | 534.2 | 597.38 |
| Single-crystal Superalloy I-beam | 16 | 15 | 61,120 | 61,100 | 916,800 | 916,500 | 76,995.21 |
| Telemetry Processor | 760 | 684 | 154,500 | 145,000 | 105,678,000 | 99,180,000 | 20,303.43 |
| Trigger Unit | 760 | 684 | 498,500 | 417,100 | 340,974,000 | 285,296,400 | 43,063.99 |
| Materials, whole job | 2,683,163,619.9 | 2,439,346,194.2 | 165,753,917.86 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 1.1 trades/day, 1 units/day.