Standup M-Set Composite Reactor Material Efficiency I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Alloyed Tritanium Bar | 1,600 | 1,440 | 2,088 | 2,087 | 3,006,720 | 3,005,280 | 1,931.02 |
| Armor Plates | 3,200 | 2,880 | 23,140 | 23,130 | 66,643,200 | 66,614,400 | 28,391.7 |
| Charred Micro Circuit | 1,600 | 1,440 | 375.1 | 375 | 540,144 | 540,000 | 325.24 |
| Contaminated Nanite Compound | 1,600 | 1,440 | 74,160 | 74,150 | 106,790,400 | 106,776,000 | 1,764.96 |
| Fried Interface Circuit | 3,200 | 2,880 | 3,394 | 3,393 | 9,774,720 | 9,771,840 | 2,198.64 |
| Malfunctioning Shield Emitter | 6,400 | 5,760 | 244.3 | 244.2 | 1,407,168 | 1,406,592 | 395.08 |
| Scorched Telemetry Processor | 1,600 | 1,440 | 2,001 | 2,000 | 2,881,440 | 2,880,000 | 61.59 |
| Smashed Trigger Unit | 1,600 | 1,440 | 4,611 | 4,610 | 6,639,840 | 6,638,400 | 73.06 |
| Tangled Power Conduit | 1,400 | 1,260 | 82,550 | 76,330 | 104,013,000 | 96,175,800 | 431.02 |
| Ward Console | 2,800 | 2,520 | 11,190 | 11,180 | 28,198,800 | 28,173,600 | 12,677.28 |
| Materials, whole job | 329,895,432 | 321,981,912 | 143,166,784.97 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.