Standup L-Set Reactor Efficiency I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Alloyed Tritanium Bar | 12,000 | 10,800 | 2,088 | 2,087 | 22,550,400 | 22,539,600 | 1,931.02 |
| Armor Plates | 24,000 | 21,600 | 23,140 | 23,130 | 499,824,000 | 499,608,000 | 28,391.7 |
| Charred Micro Circuit | 12,000 | 10,800 | 375.1 | 375 | 4,051,080 | 4,050,000 | 325.24 |
| Contaminated Nanite Compound | 12,000 | 10,800 | 74,160 | 74,150 | 800,928,000 | 800,820,000 | 1,764.96 |
| Fried Interface Circuit | 24,000 | 21,600 | 3,394 | 3,393 | 73,310,400 | 73,288,800 | 2,198.64 |
| Malfunctioning Shield Emitter | 48,000 | 43,200 | 244.3 | 244.2 | 10,553,760 | 10,549,440 | 395.08 |
| Scorched Telemetry Processor | 12,000 | 10,800 | 2,001 | 2,000 | 21,610,800 | 21,600,000 | 61.59 |
| Smashed Trigger Unit | 12,000 | 10,800 | 4,611 | 4,610 | 49,798,800 | 49,788,000 | 73.06 |
| Tangled Power Conduit | 10,500 | 9,450 | 82,550 | 76,330 | 780,097,500 | 721,318,500 | 431.02 |
| Ward Console | 21,000 | 18,900 | 11,190 | 11,180 | 211,491,000 | 211,302,000 | 12,677.28 |
| Materials, whole job | 2,474,215,740 | 2,414,864,340 | 1,073,750,887.3 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.