Assault Damage Control II
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Assault Damage Control I | 1 | 1 | 4,834 | 7.87 | 4,834 | 7.87 | — |
| Construction Blocks | 4 | 4 | 9,105 | 9,104 | 36,420 | 36,416 | 4,563.06 |
| Fernite Carbide Composite Armor Plate | 1 | 1 | 5,998 | 4,957 | 5,998 | 4,957 | 5,670.21 |
| Mechanical Parts | 6 | 6 | 10,790 | 9,860 | 64,740 | 59,160 | 4,619.43 |
| Morphite | 1 | 1 | 20,110 | 18,900 | 20,110 | 18,900 | 19,610.43 |
| Oscillator Capacitor Unit | 1 | 1 | 34,830 | 32,630 | 34,830 | 32,630 | 34,114.6 |
| Plasma Pulse Generator | 1 | 1 | 16,740 | 15,670 | 16,740 | 15,670 | 17,073.5 |
| Quantum Microprocessor | 1 | 1 | 44,790 | 39,060 | 44,790 | 39,060 | 31,547.85 |
| R.A.M.- Armor/Hull Tech | 1 | 1 | 709.9 | 612.4 | 709.9 | 612.4 | 597.29 |
| Materials, whole job | 229,171.9 | 207,413.27 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 180.8 trades/day, 607 units/day.