EveBoosters

LINKING…
Blueprint #49717Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 7.15B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job614,194,650
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job557,565,655
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Job install fee
Estimated Item Value (EIV)
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
EIV is unknown: at least one material has no published adjusted price, and a partial EIV would understate the fee. No fee is shown rather than a low one.
Install fee, whole job

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit734,100,000
Jita buy price, per unit644,800,000
Sales tax (2.02%)-14,865,525
Broker fee (1.50%)-11,011,500
Net revenue, per unit708,222,975
Net revenue, whole job (1 unit)708,222,975

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Lattice Locked Dekaisogen807279,74066,1305,741,2804,761,36029,230.63
Linear Shield Emitter15013539,36029,2905,313,6003,954,15016,283.85
Morphite908120,10018,8401,628,1001,526,04019,610.43
Radar Sensor Cluster26323720,76017,0404,920,1204,038,48014,393.98
Radiation Absorption Thruster716473,99066,0304,735,3604,225,92049,831.69
R.A.M.- Starship Tech12116906307,5906,930528
Rodiva1151,170,00041,470,00051,170,00041,470,000
Singularity Radiation Convertor2018749,600500,20013,492,8009,003,60027,717.95
Trinary State Processor1,8001,62035,98035,00058,287,60056,700,00025,880.56
Tungsten Carbide Armor Plate2,2502,0256,6886,10713,543,20012,366,6757,189.6
Zero-Point Field Manipulator750675674,600621,500455,355,000419,512,500318,724.01
Materials, whole job614,194,650557,565,655

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 8.7 trades/day, 10 units/day.