EveBoosters

LINKING…

High-grade Hydra Alpha

Market detail
Blueprint #54410Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 1.77B/day
Illiquid. High-grade Hydra Alpha under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job198,736,260
Install fee12,349,881.61
Total cost, whole job211,086,141.61
Cost per unit211,086,141.61
Profit / unit
76,023,458.39
Margin
36.0%
Profit, whole job (1 unit)76,023,458.39
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job188,664,620
Install fee12,349,881.61
Total cost, whole job201,014,501.61
Cost per unit201,014,501.61
Profit / unit
86,095,098.39
Margin
42.8%
Profit, whole job (1 unit)86,095,098.39
Job install fee
Estimated Item Value (EIV)57,521,572.49
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 57,521,572.49 × 21.47%
Install fee, whole job12,349,881.61

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit297,600,000
Jita buy price, per unit249,000,000
Sales tax (2.02%)-6,026,400
Broker fee (1.50%)-4,464,000
Net revenue, per unit287,109,600
Net revenue, whole job (1 unit)287,109,600

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Cryoprotectant Solution594535124,500123,20066,607,50065,912,00035,914.66
Drone Cerebral Fragment329297286,800260,50085,179,60077,368,5001,865.57
Morphite797220,11018,8801,447,9201,359,36019,610.43
Nano-Factory111,103,0001,071,0001,103,0001,071,000469,094.3
Synthetic Synapses54248890,98088,02044,398,24042,953,76061,911.76
Materials, whole job198,736,260188,664,62057,521,572.49

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 5.6 trades/day, 6 units/day.