EveBoosters

LINKING…

High-grade Hydra Gamma

Market detail
Blueprint #54412Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 2.38B/day
Illiquid. High-grade Hydra Gamma under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job244,602,600
Install fee24,809,783.95
Total cost, whole job269,412,383.95
Cost per unit269,412,383.95
Profit / unit
123,144,391.05
Margin
45.7%
Profit, whole job (1 unit)123,144,391.05
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job225,432,940
Install fee24,809,783.95
Total cost, whole job250,242,723.95
Cost per unit250,242,723.95
Profit / unit
142,314,051.05
Margin
56.9%
Profit, whole job (1 unit)142,314,051.05
Job install fee
Estimated Item Value (EIV)115,555,584.29
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 115,555,584.29 × 21.47%
Install fee, whole job24,809,783.95

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit406,900,000
Jita buy price, per unit362,000,000
Sales tax (2.02%)-8,239,725
Broker fee (1.50%)-6,103,500
Net revenue, per unit392,556,775
Net revenue, whole job (1 unit)392,556,775

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Drone Cerebral Fragment329297286,800260,50085,179,60077,368,5001,865.57
Gel-Matrix Biopaste887799126,600119,400101,153,40095,400,60092,204.7
Morphite14613220,11018,8802,654,5202,492,16019,610.43
Nano-Factory111,103,0001,071,0001,103,0001,071,000469,094.3
Transcranial Microcontrollers69162287,64078,94054,512,08049,100,68043,160.67
Materials, whole job244,602,600225,432,940115,555,584.29

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 5.3 trades/day, 6 units/day.