Stormbringer
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 50 | 45 | 48,650 | 45,090 | 2,189,250 | 2,029,050 | 8,583.01 |
| Crystalline Isogen-10 | 435 | 392 | 55,070 | 50,000 | 21,587,440 | 19,600,000 | — |
| Electromagnetic Metaprismatic Sheeting | 28 | 26 | 10,230 | 9,250 | 265,980 | 240,500 | — |
| Hyperbolic Metatransistor Array | 24 | 22 | 9,726 | 7,302 | 213,972 | 160,644 | — |
| Isogen | 10,000 | 9,000 | 194 | 185.2 | 1,746,000 | 1,666,800 | 194.75 |
| Life Support Backup Unit | 25 | 23 | 81,070 | 78,890 | 1,864,610 | 1,814,470 | 9,578.12 |
| Megacyte | 600 | 540 | 2,823 | 2,817 | 1,524,420 | 1,521,180 | 1,819.8 |
| Mexallon | 36,000 | 32,400 | 54.59 | 52.26 | 1,768,716 | 1,693,224 | 38.42 |
| Nocxium | 2,500 | 2,250 | 750.8 | 734.4 | 1,689,300 | 1,652,400 | 621.25 |
| Pyerite | 180,000 | 162,000 | 18.44 | 17.08 | 2,987,280 | 2,766,960 | 11.81 |
| Tritanium | 540,000 | 486,000 | 3.95 | 3.88 | 1,919,700 | 1,885,680 | 3.14 |
| Ultraconducting Ablative Nanocable | 56 | 51 | 4,626 | 4,000 | 235,926 | 204,000 | — |
| Zydrine | 1,200 | 1,080 | 1,347 | 1,314 | 1,454,760 | 1,419,120 | 1,401.2 |
| Materials, whole job | 39,447,354 | 36,654,028 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 31.2 trades/day, 45 units/day.