Thunderchild
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Auto-Integrity Preservation Seal | 200 | 180 | 48,660 | 45,100 | 8,758,800 | 8,118,000 | 8,583.01 |
| Core Temperature Regulator | 2 | 2 | 3,148,000 | 2,782,000 | 6,296,000 | 5,564,000 | 280,395.65 |
| Crystalline Isogen-10 | 768 | 692 | 50,010 | 50,000 | 34,606,920 | 34,600,000 | — |
| Electromagnetic Metaprismatic Sheeting | 82 | 74 | 10,230 | 9,250 | 757,020 | 684,500 | — |
| Hyperbolic Metatransistor Array | 94 | 85 | 9,726 | 7,302 | 826,710 | 620,670 | — |
| Isogen | 400,000 | 360,000 | 198 | 185.2 | 71,280,000 | 66,672,000 | 194.75 |
| Life Support Backup Unit | 100 | 90 | 81,070 | 79,000 | 7,296,300 | 7,110,000 | 9,578.12 |
| Megacyte | 7,000 | 6,300 | 2,825 | 2,818 | 17,797,500 | 17,753,400 | 1,819.8 |
| Mexallon | 600,000 | 540,000 | 54.66 | 52.24 | 29,516,400 | 28,209,600 | 38.42 |
| Nocxium | 42,000 | 37,800 | 750.9 | 734.8 | 28,384,020 | 27,775,440 | 621.25 |
| Pyerite | 4,000,000 | 3,600,000 | 18.41 | 17.08 | 66,276,000 | 61,488,000 | 11.81 |
| Tritanium | 8,000,000 | 7,200,000 | 3.97 | 3.87 | 28,584,000 | 27,864,000 | 3.14 |
| Ultraconducting Ablative Nanocable | 120 | 108 | 4,625 | 4,000 | 499,500 | 432,000 | — |
| Zydrine | 14,000 | 12,600 | 1,346 | 1,306 | 16,959,600 | 16,455,600 | 1,401.2 |
| Materials, whole job | 317,838,770 | 303,347,210 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 11.5 trades/day, 13 units/day.