Large Vorton Projector I
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Electromagnetic Metaprismatic Sheeting | 12 | 11 | 10,230 | 9,250 | 112,530 | 101,750 | — |
| Hyperbolic Metatransistor Array | 24 | 22 | 9,725 | 7,302 | 213,950 | 160,644 | — |
| Isogen | 19,951 | 17,956 | 198.6 | 186 | 3,566,061.6 | 3,339,816 | 194.75 |
| Megacyte | 126 | 114 | 2,825 | 2,817 | 322,050 | 321,138 | 1,819.8 |
| Mexallon | 42,197 | 37,978 | 54.67 | 52.33 | 2,076,257.26 | 1,987,388.74 | 38.42 |
| Nocxium | 1,234 | 1,111 | 751.9 | 735 | 835,360.9 | 816,585 | 621.25 |
| Pyerite | 117,839 | 106,056 | 18.42 | 17.1 | 1,953,551.52 | 1,813,557.6 | 11.81 |
| Tritanium | 328,307 | 295,477 | 3.97 | 3.87 | 1,173,043.69 | 1,143,495.99 | 3.14 |
| Ultraconducting Ablative Nanocable | 82 | 74 | 4,624 | 4,000 | 342,176 | 296,000 | — |
| Zero-Point Condensate | 940 | 846 | 38,000 | 36,830 | 32,148,000 | 31,158,180 | — |
| Materials, whole job | 42,742,980.97 | 41,138,555.33 | — | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 2.2 trades/day, 3 units/day.