EveBoosters

LINKING…

BlastShot Condenser Pack S

Market detail
Blueprint #54863Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. BlastShot Condenser Pack S no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job111,837.15
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (500 units)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job107,073.38
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (500 units)
Job install fee
Estimated Item Value (EIV)
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
EIV is unknown: at least one material has no published adjusted price, and a partial EIV would understate the fee. No fee is shown rather than a low one.
Install fee, whole job

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit79,000
Jita buy price, per unit21,940
Sales tax (2.02%)-1,599.75
Broker fee (1.50%)-1,185
Net revenue, per unit76,215.25
Net revenue, whole job (500 units)38,107,625

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 500
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Electromagnetic Metaprismatic Sheeting1110,2309,25010,2309,250
Pyerite10918.4117.08165.69153.7211.81
Tritanium20183.973.8771.4669.663.14
Ultraconducting Ablative Nanocable664,6254,00027,75024,000
Zero-Point Condensate2236,81036,80073,62073,600
Materials, whole job111,837.15107,073.38

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.