EveBoosters

LINKING…

Ladar-FTL Interlink Communicator

Market detail
Blueprint #57514Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 4.67B/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job78,864,751
Install fee15,085,100.77
Total cost, whole job93,949,851.77
Cost per unit93,949,851.77
Profit / unit
9,857,248.23
Margin
10.5%
Profit, whole job (1 unit)9,857,248.23
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job70,333,381
Install fee15,085,100.77
Total cost, whole job85,418,481.77
Cost per unit85,418,481.77
Profit / unit
18,388,618.23
Margin
21.5%
Profit, whole job (1 unit)18,388,618.23
Job install fee
Estimated Item Value (EIV)70,228,588.31
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 70,228,588.31 × 21.48%
Install fee, whole job15,085,100.77

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit107,600,000
Jita buy price, per unit91,670,000
Sales tax (2.02%)-2,178,900
Broker fee (1.50%)-1,614,000
Net revenue, per unit103,807,100
Net revenue, whole job (1 unit)103,807,100

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broadcast Node221,923,0001,863,0003,846,0003,726,0001,104,977.57
C3-FTM Acid26023470,96059,11016,604,64013,831,74068,004.12
Carbon-86 Epoxy Resin38034239,98035,68013,673,16012,202,56055,199.14
Fermionic Condensates403658,01055,5702,088,3602,000,52018,521.81
Fullerene Intercalated Graphite39035113,09011,4404,594,5904,015,4404,218.01
Fulleroferrocene6605941,3881,344824,472798,3361,152.34
Graphene Nanoribbons56050434,92029,91017,599,68015,074,64020,769.18
Lanthanum Metallofullerene19017119,98018,4303,416,5803,151,5308,735.47
Methanofullerene19017111,36010,5001,942,5601,795,50010,155.75
Plasmonic Metamaterials56050413,27013,2406,688,0806,672,9608,616.43
PPD Fullerene Fibers1901719,1998,3051,573,0291,420,1558,053.81
Scandium Metallofullerene13011716,80016,0001,965,6001,872,00021,522.39
Self-Harmonizing Power Core112,000,0001,938,0002,000,0001,938,0001,044,405.54
Wetware Mainframe112,048,0001,834,0002,048,0001,834,000797,632.02
Materials, whole job78,864,75170,333,38170,228,588.31

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 9.9 trades/day, 46 units/day.