EveBoosters

LINKING…
Blueprint #689Build system Jita 0.9 · The ForgeIndex 17.23%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 58.9M/day
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job425,695.5
Install fee78,349.85
Total cost, whole job504,045.35
Cost per unit504,045.35
Profit / unit
16,919.65
Margin
3.4%
Profit, whole job (1 unit)16,919.65
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job404,433
Install fee78,349.85
Total cost, whole job482,782.85
Cost per unit482,782.85
Profit / unit
38,182.15
Margin
7.9%
Profit, whole job (1 unit)38,182.15
Job install fee
Estimated Item Value (EIV)364,757.23
fee = EIV × ( index 17.23% + facility 0.25% + SCC 4% )
= 364,757.23 × 21.48%
Install fee, whole job78,349.85

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit540,000
Jita buy price, per unit496,800
Sales tax (2.02%)-10,935
Broker fee (1.50%)-8,100
Net revenue, per unit520,965
Net revenue, whole job (1 unit)520,965

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Isogen500450198.518589,32583,250194.75
Mexallon2,5002,25054.6552.22122,962.5117,49538.42
Pyerite6,0005,40018.417.0899,36092,23211.81
Tritanium32,00028,8003.963.87114,048111,4563.14
Materials, whole job425,695.5404,433364,757.23

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 43.7 trades/day, 102 units/day.