EveBoosters

LINKING…

Expired Sinister Exotic Filament

Market detail
Blueprint #80003Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
The buy-order column is withheld: nobody is bidding on F-24 Entangled GQD, so there is no bid price to accumulate at. The ask basis is unaffected.
Illiquid. Expired Sinister Exotic Filament no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job911,489.88
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job
Install fee
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Job install fee
Estimated Item Value (EIV)
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
EIV is unknown: at least one material has no published adjusted price, and a partial EIV would understate the fee. No fee is shown rather than a low one.
Install fee, whole job

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit199,000
Jita buy price, per unit15,020
Sales tax (2.02%)-4,029.75
Broker fee (1.50%)-2,985
Net revenue, per unit191,985.25
Net revenue, whole job (1 unit)191,985.25

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
B-53 Entangled GQD558,797339.143,9851,695.5
B-66 Entangled GQD554,075416.820,3752,084
F-16 Entangled GQD15144801506,7202,100
F-24 Entangled GQD1091,68815,192
F-33 Entangled GQD552,989140.214,945701
Isolated Dimensional Thread605415,00090.21810,0004,871.34
Pyerite10918.4117.08165.69153.7211.81
Tritanium30273.973.87107.19104.493.14
Materials, whole job911,489.88

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.