Torrent
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Construction Blocks | 225 | 203 | 9,105 | 9,104 | 1,848,315 | 1,848,112 | 4,563.06 |
| Electromechanical Microprocessor | 1,800 | 1,620 | 95,440 | 61,980 | 154,612,800 | 100,407,600 | 31,253.62 |
| Fission Reactor Unit | 45 | 41 | 119,700 | 50,580 | 4,907,700 | 2,073,780 | 41,690.14 |
| Fission Thruster | 75 | 68 | 27,850 | 3,010 | 1,893,800 | 204,680 | 8,443.14 |
| Hyperconductive Gravimetric Sensor Cluster | 135 | 122 | 20,380 | 100.5 | 2,486,360 | 12,261 | 18,348.61 |
| Metaprismatic Armor Plate | 5,250 | 4,725 | 7,093 | 5,892 | 33,514,425 | 27,839,700 | 5,117.17 |
| Morphite | 105 | 95 | 20,110 | 18,880 | 1,910,450 | 1,793,600 | 19,610.43 |
| Pentachoron Capacitor Unit | 300 | 270 | 79,430 | 72,010 | 21,446,100 | 19,442,700 | 39,692.03 |
| R.A.M.- Starship Tech | 15 | 14 | 690 | 640 | 9,660 | 8,960 | 528 |
| Repelling Shield Emitter | 375 | 338 | 39,450 | 33,740 | 13,334,100 | 11,404,120 | 20,266.61 |
| Squall | 1 | 1 | 18,720,000 | 16,690,000 | 18,720,000 | 16,690,000 | 15,757,430.78 |
| Materials, whole job | 254,683,710 | 181,725,513 | 126,466,740.51 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 16.8 trades/day, 19 units/day.