EveBoosters

LINKING…

Isogen Prospecting Array 2

Market detail
Blueprint #82601Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d /day
Illiquid. Isogen Prospecting Array 2 no trade history yet; no daily volume yet. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job89,451,000
Install fee13,243,651.29
Total cost, whole job102,694,651.29
Cost per unit102,694,651.29
Profit / unit
131,353,698.71
Margin
127.9%
Profit, whole job (1 unit)131,353,698.71
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job83,864,800
Install fee13,243,651.29
Total cost, whole job97,108,451.29
Cost per unit97,108,451.29
Profit / unit
136,939,898.71
Margin
141.0%
Profit, whole job (1 unit)136,939,898.71
Job install fee
Estimated Item Value (EIV)61,684,449.4
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 61,684,449.4 × 21.47%
Install fee, whole job13,243,651.29

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit242,600,000
Jita buy price, per unit30,040,000
Sales tax (2.02%)-4,912,650
Broker fee (1.50%)-3,639,000
Net revenue, per unit234,048,350
Net revenue, whole job (1 unit)234,048,350

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broadcast Node551,922,0001,863,0009,610,0009,315,0001,104,977.57
Capital Construction Parts229,186,0008,421,00018,372,00016,842,00011,323,984.26
Integrity Response Drones442,310,0002,179,0009,240,0008,716,0001,131,935.28
Nano-Factory771,103,0001,071,0007,721,0007,497,000469,094.3
Organic Mortar Applicators881,096,000998,6008,768,0007,988,800480,335.99
Recursive Computing Module551,500,0001,443,0007,500,0007,215,000910,308.96
Self-Harmonizing Power Core552,000,0001,935,00010,000,0009,675,0001,044,405.54
Sterile Conduits881,255,0001,159,00010,040,0009,272,0001,111,675.42
Wetware Mainframe442,050,0001,836,0008,200,0007,344,000797,632.02
Materials, whole job89,451,00083,864,80061,684,449.4

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: trades/day, units/day.