EveBoosters

LINKING…

Mexallon Prospecting Array 3

Market detail
Blueprint #87737Build system Jita 0.9 · The ForgeIndex 17.21%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 500.7M/day
Illiquid. Mexallon Prospecting Array 3 trades under 5 times a day; under 10 units traded a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job170,002,000
Install fee26,474,965.68
Total cost, whole job196,476,965.68
Cost per unit196,476,965.68
Profit / unit
39,886,784.32
Margin
20.3%
Profit, whole job (1 unit)39,886,784.32
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job158,490,000
Install fee26,474,965.68
Total cost, whole job184,964,965.68
Cost per unit184,964,965.68
Profit / unit
51,398,784.32
Margin
27.8%
Profit, whole job (1 unit)51,398,784.32
Job install fee
Estimated Item Value (EIV)123,368,898.79
fee = EIV × ( index 17.21% + facility 0.25% + SCC 4% )
= 123,368,898.79 × 21.46%
Install fee, whole job26,474,965.68

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit245,000,000
Jita buy price, per unit35,000,000
Sales tax (2.02%)-4,961,250
Broker fee (1.50%)-3,675,000
Net revenue, per unit236,363,750
Net revenue, whole job (1 unit)236,363,750

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Broadcast Node1091,922,0001,863,00017,298,00016,767,0001,104,977.57
Capital Construction Parts449,186,0008,421,00036,744,00033,684,00011,323,984.26
Integrity Response Drones882,310,0002,179,00018,480,00017,432,0001,131,935.28
Nano-Factory14131,103,0001,071,00014,339,00013,923,000469,094.3
Organic Mortar Applicators16151,095,000998,60016,425,00014,979,000480,335.99
Recursive Computing Module1091,499,0001,354,00013,491,00012,186,000910,308.96
Self-Harmonizing Power Core1092,000,0001,935,00018,000,00017,415,0001,044,405.54
Sterile Conduits16151,255,0001,160,00018,825,00017,400,0001,111,675.42
Wetware Mainframe882,050,0001,838,00016,400,00014,704,000797,632.02
Materials, whole job170,002,000158,490,000123,368,898.79

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 1.3 trades/day, 1 units/day.