Xarasier Capital Ancillary Shield Booster
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| Computer Chips | 20 | 18 | 180 | 83.15 | 3,240 | 1,496.7 | 78.58 |
| Construction Alloy | 20 | 18 | 60 | 5.13 | 1,080 | 92.34 | 97.38 |
| Electric Conduit | 40 | 36 | 15.35 | 15.34 | 552.6 | 552.24 | 24.47 |
| Isogen | 72,656 | 65,391 | 198.6 | 186 | 12,986,652.6 | 12,162,726 | 194.75 |
| Megacyte | 6,341 | 5,707 | 2,825 | 2,817 | 16,122,275 | 16,076,619 | 1,819.8 |
| Mexallon | 116,778 | 105,101 | 54.67 | 52.33 | 5,745,871.67 | 5,499,935.33 | 38.42 |
| Nocxium | 12,230 | 11,007 | 751.9 | 735 | 8,276,163.3 | 8,090,145 | 621.25 |
| Power Couplings | 60 | 54 | 26.3 | 26.24 | 1,420.2 | 1,416.96 | 84.54 |
| Pyerite | 611,423 | 550,281 | 18.42 | 17.1 | 10,136,176.02 | 9,409,805.1 | 11.81 |
| Spare Parts | 40 | 36 | 4.17 | 4.16 | 150.12 | 149.76 | 37.71 |
| Tritanium | 834,277 | 750,850 | 3.97 | 3.87 | 2,980,874.5 | 2,905,789.5 | 3.14 |
| Zydrine | 4,977 | 4,480 | 1,347 | 1,308 | 6,034,560 | 5,859,840 | 1,401.2 |
| Materials, whole job | 62,289,016.01 | 60,008,567.93 | 54,600,656.39 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.23%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: — trades/day, — units/day.