EveBoosters

LINKING…

Erratic Ore Mining Crystal Type A II

Market detail
Blueprint #90057Build system Jita 0.9 · The ForgeIndex 17.22%Facility tax 0.25%SCC 4%Structure bonus 1Material rig 1ME 10Runs 1Omega cloneJita 30d 47.8M/day
The buy-order column is withheld: nobody is bidding on Erratic Ore Mining Crystal Type A I, so there is no bid price to accumulate at. The ask basis is unaffected.
Illiquid. Erratic Ore Mining Crystal Type A II trades under 5 times a day. Any profit below is arithmetic on a book that barely moves — it is not a business you could run at size.
Buy materials at the Jita ask

Instant. You clear the sell orders and start the job today.

Materials, whole job574,161.9
Install fee124,405.31
Total cost, whole job698,567.21
Cost per unit698,567.21
Profit / unit
266,182.79
Margin
38.1%
Profit, whole job (1 unit)266,182.79
Buy materials with buy orders

Cheaper, but you wait for the fills — and the bid can move while you do.

Materials, whole job
Install fee124,405.31
Total cost, whole job
Cost per unit
Profit / unit
Margin
Profit, whole job (1 unit)
Job install fee
Estimated Item Value (EIV)579,437.87
fee = EIV × ( index 17.22% + facility 0.25% + SCC 4% )
= 579,437.87 × 21.47%
Install fee, whole job124,405.31

The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.

Sale in Jita
Jita sell price, per unit1,000,000
Jita buy price, per unit249,100
Sales tax (2.02%)-20,250
Broker fee (1.50%)-15,000
Net revenue, per unit964,750
Net revenue, whole job (1 unit)964,750

Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.

Bill of materials
ME 10Runs 1Yields 1
MaterialBase / runUnits / jobJita askJita bidLine @ askLine @ bidEIV basis
Erratic Ore Mining Crystal Type A I11397,400397,400500,456.92
Hypersynaptic Fibers30276,5246,455176,148174,2852,613.94
R.A.M.- Electronics11613.9501.7613.9501.7562.82
Materials, whole job574,161.9579,437.87

EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.

Assumptions behind every number above
  • Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
  • Installed in Jita, manufacturing cost index 17.22%. Facility tax 0.25%, SCC surcharge 4%.
  • Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
  • Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
  • 30-day Jita context: 2.3 trades/day, 32 units/day.