Manufacturing · SDE blueprints × live Jita book
Industry
Browse everything with a manufacturing blueprint, priced two ways: materials bought instantly at the Jita ask, or accumulated through buy orders at the Jita bid. The install fee is charged on the job’s Estimated Item Value at CCP’s adjusted prices — not on what you pay for the materials — so ME never reduces it and the build system does. Every assumption is in the URL. Items whose materials we cannot price show no total at all.
3 illiquid items hidden — under 5 trades or 10 units a day, or no real order on one side of the book.Include illiquid items
| Item | Yield / job | Jita sell | Cost/u · ask | Cost/u · bid | Profit/u · ask | Profit/u · bid | Margin · ask | ISK/day | Trades/d |
|---|---|---|---|---|---|---|---|---|---|
| Small Rocket Fuel Cache Partition II | 1 | 4.7M | 3.0M | 2.9M | 1.5M | 1.6M | 52.1% | 441.6M | 32.6 |
| Small Bay Loading Accelerator II | 1 | 4.4M | 3.0M | 2.9M | 1.3M | 1.3M | 43.2% | 1.06B | 95.7 |
| Small Hydraulic Bay Thrusters II | 1 | 4.1M | 3.0M | 2.9M | 972.7k | 1.0M | 32.8% | 1.05B | 48.6 |
| Small Warhead Calefaction Catalyst II | 1 | 3.8M | 3.0M | 2.9M | 702.5k | 753.6k | 23.7% | 436.3M | 28.4 |
| Small Warhead Rigor Catalyst I | 1 | 384.0k | 213.2k | 213.2k | 157.2k | 157.3k | 73.7% | 35.7M | 16.4 |
| Small Rocket Fuel Cache Partition I | 1 | 349.5k | 213.2k | 213.2k | 124.0k | 124.0k | 58.1% | 23.7M | 17.0 |
| Small Hydraulic Bay Thrusters I | 1 | 330.0k | 213.2k | 213.2k | 105.1k | 105.2k | 49.3% | 23.0M | 25.7 |
| Small Warhead Calefaction Catalyst I | 1 | 390.0k | 311.2k | 311.1k | 65.1k | 65.1k | 20.9% | 82.7M | 56.3 |
| Small Warhead Rigor Catalyst II | 1 | 2.8M | 3.0M | 2.9M | -271.9k | -220.8k | -9.2% | 143.5M | 11.8 |