Manufacturing · SDE blueprints × live Jita book
Industry
Browse everything with a manufacturing blueprint, priced two ways: materials bought instantly at the Jita ask, or accumulated through buy orders at the Jita bid. The install fee is charged on the job’s Estimated Item Value at CCP’s adjusted prices — not on what you pay for the materials — so ME never reduces it and the build system does. Every assumption is in the URL. Items whose materials we cannot price show no total at all.
Showing illiquid items too. Rows tagged illiquid trade under 5 times or 10 units a day, or have no real order on one side — their margins are computed from a book that barely moves.Hide illiquid
| Item | Yield / job | Jita sell | Cost/u · ask | Cost/u · bid | Profit/u · ask | Profit/u · bid | Margin · ask | ISK/day | Trades/d |
|---|---|---|---|---|---|---|---|---|---|
| Large Projectile Collision Accelerator IIilliquid | 1 | 48.3M | 15.6M | 14.4M | 31.0M | 32.2M | 198.5% | — | — |
| Large Projectile Ambit Extension Iilliquid | 1 | 2.2M | 712.2k | 670.7k | 1.5M | 1.5M | 204.2% | 6.9M | 2.5 |
| Large Projectile Ambit Extension IIilliquid | 1 | 11.0M | 9.3M | 8.6M | 1.2M | 2.0M | 13.4% | 61.6M | 2.7 |
| Large Projectile Metastasis Adjuster IIilliquid | 1 | 10.9M | 9.3M | 8.6M | 1.2M | 1.9M | 13.0% | 47.3M | 3.1 |
| Large Projectile Metastasis Adjuster Iilliquid | 1 | 1.3M | 712.2k | 670.7k | 562.2k | 603.8k | 78.9% | 3.4M | 2.3 |
| Large Projectile Burst Aerator Iilliquid | 1 | 1.4M | 969.8k | 911.7k | 419.4k | 477.5k | 43.3% | 5.9M | 2.6 |
| Large Projectile Locus Coordinator Iilliquid | 1 | 972.2k | 712.2k | 670.7k | 225.7k | 267.3k | 31.7% | 4.2M | 1.3 |
| Large Projectile Collision Accelerator Iilliquid | 1 | 1.3M | 1.1M | 1.0M | 166.7k | 231.6k | 15.5% | 5.2M | 2.5 |
| Large Projectile Burst Aerator II | 1 | 13.6M | 13.5M | 12.5M | -391.8k | 648.7k | -2.9% | 170.6M | 6.5 |
| Large Projectile Locus Coordinator IIilliquid | 1 | 5.8M | 9.3M | 8.6M | -3.7M | -3.0M | -40.1% | 20.7M | 1.7 |