Self-Assembling Nanolattice
Market detailInstant. You clear the sell orders and start the job today.
Cheaper, but you wait for the fills — and the bid can move while you do.
The fee is charged on the job’s Estimated Item Value — the blueprint’s ME0 quantities priced at CCP’s adjusted prices — not on what the materials cost you. A researched blueprint cuts your material bill and leaves this number completely unchanged. Where you install the job is the lever that moves it.
Fee profile: Omega trader. Sales tax always applies; the broker fee is charged because the realistic exit is a sell order at the ask, not dumping the run into buy orders.
| Material | Base / run | Units / job | Jita ask | Jita bid | Line @ ask | Line @ bid | EIV basis |
|---|---|---|---|---|---|---|---|
| C3-FTM Acid | 5 | 5 | 70,980 | 59,120 | 354,900 | 295,600 | 68,004.12 |
| Carbon-86 Epoxy Resin | 13 | 12 | 39,960 | 35,710 | 479,520 | 428,520 | 55,199.14 |
| Central System Controller | 1 | 1 | 9,297 | 8,619 | 9,297 | 8,619 | 1,058.06 |
| Defensive Control Node | 1 | 1 | 10,500 | 8,614 | 10,500 | 8,614 | 501.57 |
| Emergent Combat Intelligence | 1 | 1 | 12,540 | 8,254 | 12,540 | 8,254 | 1,835.05 |
| Fulleroferrocene | 300 | 270 | 1,389 | 1,345 | 375,030 | 363,150 | 1,152.34 |
| Graphene Nanoribbons | 15 | 14 | 34,970 | 29,940 | 489,580 | 419,160 | 20,769.18 |
| Heuristic Selfassemblers | 2 | 2 | 41,970 | 34,160 | 83,940 | 68,320 | 346.67 |
| Jump Drive Control Nexus | 1 | 1 | 9,283 | 8,353 | 9,283 | 8,353 | 634.59 |
| Lanthanum Metallofullerene | 40 | 36 | 19,990 | 18,440 | 719,640 | 663,840 | 8,735.47 |
| Neurovisual Input Matrix | 15 | 14 | 218,800 | 209,300 | 3,063,200 | 2,930,200 | 53.59 |
| Thermoelectric Catalysts | 1 | 1 | 10,410 | 9,303 | 10,410 | 9,303 | 634.83 |
| Materials, whole job | 5,617,840 | 5,211,933 | 2,070,429.66 | ||||
EIV basis is CCP’s published adjusted price. It exists to compute the install fee and nothing else — nobody sells at it, so it is never used as a cost here.
- Material efficiency 10 and 1 run. ME is applied to the whole job and rounded once, never per run, and no material ever drops below one unit per run.
- Installed in Jita, manufacturing cost index 17.21%. Facility tax 0.25%, SCC surcharge 4%.
- Materials and the finished item are priced from the live Jita book (The Forge). The install fee is computed from CCP’s adjusted prices, which are an index, not a quote.
- Sale assumes a sell order at the current Jita ask, paying 2.02% sales tax and 1.50% broker fee (Omega trader). No hauling, no time cost, no blueprint cost.
- 30-day Jita context: 3.3 trades/day, 50 units/day.