Manufacturing · SDE blueprints × live Jita book
Industry
Browse everything with a manufacturing blueprint, priced two ways: materials bought instantly at the Jita ask, or accumulated through buy orders at the Jita bid. The install fee is charged on the job’s Estimated Item Value at CCP’s adjusted prices — not on what you pay for the materials — so ME never reduces it and the build system does. Every assumption is in the URL. Items whose materials we cannot price show no total at all.
Showing illiquid items too. Rows tagged illiquid trade under 5 times or 10 units a day, or have no real order on one side — their margins are computed from a book that barely moves.Hide illiquid
| Item | Yield / job | Jita sell | Cost/u · ask | Cost/u · bid | Profit/u · ask | Profit/u · bid | Margin · ask | ISK/day | Trades/d |
|---|---|---|---|---|---|---|---|---|---|
| Standup XL-Set Ship Manufacturing Efficiency IIilliquid | 1 | 349.60B | 146.36B | 130.22B | 190.92B | 207.06B | 130.4% | — | — |
| Standup XL-Set Ship Manufacturing Efficiency Iilliquid | 1 | 34.97B | 27.15B | 24.76B | 6.59B | 8.98B | 24.3% | — | — |
| Standup XL-Set Structure and Component Manufacturing Efficiency Iilliquid | 1 | 34.97B | 27.15B | 24.76B | 6.59B | 8.98B | 24.3% | — | — |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency Iilliquid | 1 | 34.95B | 27.15B | 24.76B | 6.57B | 8.96B | 24.2% | 45.25B | 1.1 |
| Standup XL-Set Laboratory Optimization Iilliquid | 1 | 13.97B | 8.49B | 8.22B | 4.99B | 5.26B | 58.8% | 18.95B | 1.1 |
| Standup XL-Set Thukker Structure and Component Manufacturing Efficiencyilliquid | 1 | 34.97B | 35.97B | 1.25B | -2.23B | 32.49B | -6.2% | — | — |
| Standup XL-Set Equipment and Consumable Manufacturing Efficiency IIilliquid | 1 | — | 146.36B | 130.22B | — | — | — | — | — |
| Standup XL-Set Laboratory Optimization IIilliquid | 1 | — | 89.11B | 77.01B | — | — | — | — | — |
| Standup XL-Set Structure and Component Manufacturing Efficiency IIilliquid | 1 | — | 146.36B | 130.22B | — | — | — | — | — |