EveBoosters

LINKING…

Manufacturing · SDE blueprints × live Jita book

Industry

Browse everything with a manufacturing blueprint, priced two ways: materials bought instantly at the Jita ask, or accumulated through buy orders at the Jita bid. The install fee is charged on the job’s Estimated Item Value at CCP’s adjusted prices — not on what you pay for the materials — so ME never reduces it and the build system does. Every assumption is in the URL. Items whose materials we cannot price show no total at all.

Build system Jita 0.9Index 17.23%SCC 4%Facility tax 0.25%ME 10Runs 1Omega cloneCatalogue 1026 categories
Showing illiquid items too. Rows tagged illiquid trade under 5 times or 10 units a day, or have no real order on one side — their margins are computed from a book that barely moves.Hide illiquid
ItemYield / jobJita sellCost/u · askCost/u · bidProfit/u · askProfit/u · bidMargin · askISK/dayTrades/d
Standup M-Set Blueprint Copy Cost Optimization IIilliquid12.20B714.4M617.6M1.41B1.50B196.7%
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency IIilliquid12.10B1.17B1.04B852.0M981.1M72.8%2.16B1.1
Standup M-Set Advanced Small Ship Manufacturing Time Efficiency IIilliquid11.98B1.17B1.04B737.2M866.3M63.0%
Standup M-Set Structure Manufacturing Time Efficiency IIilliquid11.95B1.17B1.04B705.4M834.5M60.2%1.85B1.0
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%1.89B1.3
Standup M-Set Basic Medium Ship Manufacturing Time Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%
Standup M-Set Basic Small Ship Manufacturing Material Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%2.35B1.2
Standup M-Set Basic Small Ship Manufacturing Time Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%
Standup M-Set Drone and Fighter Manufacturing Time Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%1.87B1.1
Standup M-Set Advanced Component Manufacturing Time Efficiency IIilliquid11.93B1.17B1.04B686.1M815.2M58.6%
Standup M-Set Invention Accelerator IIilliquid11.45B714.4M617.6M683.5M780.3M95.7%
Standup M-Set Advanced Large Ship Manufacturing Time Efficiency IIilliquid11.90B1.17B1.04B661.9M791.1M56.5%2.44B1.1
Standup M-Set Basic Large Ship Manufacturing Time Efficiency IIilliquid11.90B1.17B1.04B661.9M791.1M56.5%2.31B1.0
Standup M-Set Ammunition Manufacturing Material Efficiency IIilliquid11.90B1.17B1.04B659.1M788.2M56.3%2.10B1.0
Standup M-Set Ammunition Manufacturing Time Efficiency IIilliquid11.90B1.17B1.04B659.1M788.2M56.3%
Standup M-Set Equipment Manufacturing Time Efficiency IIilliquid11.90B1.25B1.12B581.5M711.7M46.5%2.15B1.1
Standup M-Set ME Research Cost Optimization IIilliquid11.32B714.4M617.6M563.9M660.7M78.9%
Standup M-Set TE Research Cost Optimization IIilliquid11.32B714.4M617.6M563.9M660.7M78.9%
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency IIilliquid11.78B1.17B1.04B545.2M674.3M46.6%1.89B1.1
Standup M-Set Basic Capital Component Manufacturing Time Efficiency IIilliquid11.75B1.17B1.04B517.2M646.4M44.2%
Standup M-Set Invention Cost Optimization IIilliquid11.20B714.4M617.6M442.3M539.1M61.9%
Standup M-Set Ammunition Manufacturing Time Efficiency Iilliquid1699.7M360.4M328.6M314.6M346.5M87.3%774.9M1.1
Standup M-Set Drone and Fighter Manufacturing Time Efficiency Iilliquid1650.0M360.4M328.6M266.6M298.5M74.0%705.2M1.2
Standup M-Set Basic Small Ship Manufacturing Time Efficiency Iilliquid1649.0M360.4M328.6M265.7M297.5M73.7%658.7M1.0
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency IIilliquid11.40B1.17B1.04B176.7M305.8M15.1%1.61B1.2
Standup M-Set Basic Large Ship Manufacturing Material Efficiency IIilliquid11.40B1.17B1.04B176.7M305.8M15.1%
Standup M-Set ME Research Accelerator IIilliquid1900.0M714.4M617.6M153.9M250.6M21.5%998.6M1.1
Standup M-Set Advanced Large Ship Manufacturing Time Efficiency Iilliquid1499.0M360.4M328.6M121.0M152.8M33.6%643.0M1.1
Standup M-Set TE Research Accelerator IIilliquid1825.0M714.4M617.6M81.5M178.3M11.4%
Standup M-Set TE Research Cost Optimization Iilliquid1197.0M113.2M109.6M76.9M80.5M68.0%180.5M1.2
Standup M-Set Advanced Small Ship Manufacturing Time Efficiency Iilliquid1450.0M360.4M328.6M73.7M105.6M20.4%
Standup M-Set Basic Large Ship Manufacturing Time Efficiency Iilliquid1450.0M360.4M328.6M73.7M105.6M20.4%
Standup M-Set Advanced Component Manufacturing Material Efficiency IIilliquid11.27B1.17B1.04B59.0M188.1M5.0%1.52B1.1
Standup M-Set Basic Medium Ship Manufacturing Time Efficiency Iilliquid1425.0M360.4M328.6M49.6M81.4M13.8%700.9M1.1
Standup M-Set Equipment Manufacturing Material Efficiency IIilliquid11.25B1.17B1.04B34.9M164.0M3.0%1.61B1.2
Standup M-Set Thukker Advanced Component Manufacturing Material Efficiencyilliquid1450.0M416.1M376.3M18.1M57.9M4.3%
Standup M-Set Blueprint Copy Accelerator IIilliquid1750.0M714.4M617.6M9.1M105.9M1.3%1.28B1.2
Standup M-Set Basic Small Ship Manufacturing Material Efficiency Iilliquid1379.0M360.4M328.6M5.2M37.1M1.4%564.5M1.4
Standup M-Set Invention Accelerator Iilliquid1120.0M113.2M109.6M2.6M6.2M2.3%182.4M1.3
Standup M-Set Blueprint Copy Cost Optimization Iilliquid1119.0M113.2M109.6M1.7M5.2M1.5%159.8M1.2
Standup M-Set Invention Cost Optimization Iilliquid1119.0M113.2M109.6M1.7M5.2M1.5%201.1M1.5
Standup M-Set Blueprint Copy Accelerator Iilliquid1118.0M113.2M109.6M688.8k4.3M0.6%206.7M1.4
Standup M-Set TE Research Accelerator Iilliquid1115.0M113.2M109.6M-2.2M1.4M-1.9%189.2M1.4
Standup M-Set ME Research Cost Optimization Iilliquid1114.0M113.2M109.6M-3.2M424.6k-2.8%170.1M1.3
Standup M-Set ME Research Accelerator Iilliquid1113.0M113.2M109.6M-4.1M-540.2k-3.7%188.2M1.5
Standup M-Set Basic Capital Component Manufacturing Material Efficiency IIilliquid11.20B1.17B1.04B-13.4M115.7M-1.1%1.68B1.2
Standup M-Set Structure Manufacturing Material Efficiency IIilliquid11.20B1.17B1.04B-13.4M115.7M-1.1%2.17B1.5
Standup M-Set Drone and Fighter Manufacturing Material Efficiency IIilliquid11.20B1.17B1.04B-15.3M113.8M-1.3%
Standup M-Set Structure Manufacturing Material Efficiency Iilliquid1347.8M360.4M328.6M-24.9M7.0M-6.9%503.2M1.3
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency Iilliquid1345.0M360.4M328.6M-27.6M4.3M-7.7%
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency Iilliquid1345.0M360.4M328.6M-27.6M4.3M-7.7%598.0M1.5
Standup M-Set Basic Large Ship Manufacturing Material Efficiency Iilliquid1345.0M360.4M328.6M-27.6M4.3M-7.7%
Standup M-Set Drone and Fighter Manufacturing Material Efficiency Iilliquid1345.0M360.4M328.6M-27.6M4.3M-7.7%
Standup M-Set Equipment Manufacturing Material Efficiency Iilliquid1344.9M360.4M328.6M-27.7M4.2M-7.7%587.2M1.5
Standup M-Set Equipment Manufacturing Time Efficiency Iilliquid1343.0M360.4M328.6M-29.5M2.3M-8.2%517.1M1.3
Standup M-Set Ammunition Manufacturing Material Efficiency Iilliquid1344.0M362.0M330.1M-30.1M1.7M-8.3%501.2M1.3
Standup M-Set Structure Manufacturing Time Efficiency Iilliquid1342.0M360.4M328.6M-30.5M1.4M-8.5%
Standup M-Set Advanced Component Manufacturing Time Efficiency Iilliquid1340.0M360.4M328.6M-32.4M-568.0k-9.0%605.8M1.4
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency Iilliquid1340.0M360.4M328.6M-32.4M-568.0k-9.0%
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency Iilliquid1340.0M360.4M328.6M-32.4M-568.0k-9.0%477.0M1.2
Standup M-Set Basic Capital Component Manufacturing Time Efficiency Iilliquid1340.0M360.4M328.6M-32.4M-568.0k-9.0%
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency Iilliquid1340.0M360.4M328.6M-32.4M-568.0k-9.0%545.5M1.4
Standup M-Set Advanced Component Manufacturing Material Efficiency Iilliquid1339.0M360.4M328.6M-33.4M-1.5M-9.3%539.6M1.5
Standup M-Set Basic Capital Component Manufacturing Material Efficiency Iilliquid1335.0M360.4M328.6M-37.2M-5.4M-10.3%
Standup M-Set Thukker Basic Capital Component Manufacturing Material Efficiencyilliquid1349.0M398.3M354.9M-61.6M-18.2M-15.5%
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency IIilliquid11.10B1.17B1.04B-109.9M19.3M-9.4%2.06B1.2